Go Back   Novahq.net Forum > Games > Joint Operations
FAQ Community Calendar Today's Posts Search

Joint Operations Anything about the Joint Operations series of games.

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 05-16-2006, 09:39 AM
maddog-inc is offline maddog-inc
Registered User

Join Date: Jan 2005
Posts: 17

aligning tunnels and sewers-help needed

aligning tunnels and sewers

Just started to mess with NILE again and just wondered if theres an easy way to align tunnels and sewers as its taking me ages to get them in the right position then testing the map and finding that there not aligned properly.
__________________

If it says im playing Joint Ops,
come find me in the RSU server.
Reply With Quote
  #2  
Old 05-16-2006, 12:24 PM
Hellfighter is offline Hellfighter
Hellfighter's Avatar
Chief ADFP

Join Date: Jun 2002
Location: San Jose Calif 95111
Posts: 21,143

Send a message via ICQ to Hellfighter
will there is DF: Xtreme Map editor you can import it into JOTR it has a wire frame to use to line tunnels up with.

sorry i really never care about nile much, don't know if there a wire frame in it or not.


i still have to buy JOTR: E Mod still, have all other but that one.

DFX to JOTR Map editer: http://www.novahq.net/?show=utilitie...et_file&id=326

and all so:

NPJ-2-MIS Converter:
link: http://www.novahq.net/?show=utilitie...et_file&id=324
__________________
* altnews sources [getmo & others news] not found main FNN: realrawnews.com
*Discord: Unknown77#7121
Playing now days: EA Games> swtor [star wars old republic]

Last edited by Hellfighter; 05-16-2006 at 12:33 PM.
Reply With Quote
  #3  
Old 05-16-2006, 03:21 PM
Lucky is offline Lucky
Registered User

Join Date: Aug 2004
Posts: 4,705

you can use the snap option, works like a charm
__________________
Reply With Quote
  #4  
Old 06-01-2007, 07:38 PM
the teacher is offline the teacher
Registered User

Join Date: Jul 2006
Posts: 7

Just ajust the height of each 1.Make sure u have absolute height checked off.then just pick a piece,select absolute height and copy wat it says.then select all sewer pipes and put ur copied numbers into the height box(make sure u have d absolute height box checked)they will be aliged exept for some minor stuff.If u want 2 fix d minor stuff, then go in 3D 2 ajust it.Hope this helps(d=the 2=to 1=one wat=what ur=your u=you)
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Tunnels smittan Joint Operations 0 06-29-2005 04:19 PM
aligning walls SupraXT Delta Force 13 05-31-2004 09:17 AM
Tunnels CUM-Kingpin Delta Force 12 05-05-2004 10:08 AM
Tunnels Spam_Man Delta Force 5 04-21-2002 03:38 PM
tunnels 1SHOT Delta Force 2 12-15-2001 11:11 AM


All times are GMT -5. The time now is 11:29 PM.




Powered by vBulletin®